
{"id":7980,"date":"2019-07-01T17:59:30","date_gmt":"2019-07-01T23:59:30","guid":{"rendered":"https:\/\/rctc.edu\/echo\/?p=7980"},"modified":"2019-07-01T17:59:30","modified_gmt":"2019-07-01T23:59:30","slug":"construction-projects-continue-throughout-summer","status":"publish","type":"post","link":"https:\/\/www.rctc.edu\/echo\/construction-projects-continue-throughout-summer\/","title":{"rendered":"Construction projects continue throughout summer"},"content":{"rendered":"<p>Echo staff report<\/p>\n<p>Bring a hard hat if you\u2019re going to be on campus this summer.<br>\nThere will be a flurry of construction projects. Here\u2019s an overview of the renovations scheduled across campus immediately after commencement.<\/p>\n<p><strong>Plaza-Memorial Hall project<\/strong><br>\nWork continues on the project, with anew flurry of activity beginning shortly after commencement including:<br>\n\u00ef Moving of the Plaza Hall Anatomy and Physiology labs to the second floor of the Science and Technology Building.\u2020The anatomy and physiology labs are moving to space currently occupied by ST205, 209, 211, 213, and 214.<br>\n\u00ef Singley Hall 110 and 210 are getting new seating, finishes, and improved ventilation.<br>\n\u00ef College Center 206\/209 (current Echo office and piano labs) will be renovated.<br>\nEast Hall<br>\n\u00ef Currently empty office space on the second floor of East Hall will be renovated to house the art faculty beginning this fall.\u2020Work is expected to begin in June.<br>\nCampus signage<br>\n\u00ef New signage will be installed in the Heintz Center this summer.<\/p>\n<p><strong>Atrium<\/strong><br>\nThe Atrium exterior areas will receive a significant makeover this summer including:<br>\n\u00ef New concrete, entry<br>\n\u00ef Stair removal<br>\n\u00ef Removal of driveway along Student Services building and East Hall<br>\n\u00ef New plaza\/patio area<br>\nSports complex<br>\n\u00ef New turf will be installed in the stadium beginning in July.<br>\n\u00ef The Performance Court floor will be refinished and ready for use in July.<br>\n\u00ef North Lot drive lane (in front of Sports Center) will be repaired and resurfaced.<\/p>\n<p><strong>Heintz B-Wing (H1100 suite)<\/strong><br>\n\u00ef HVAC improvements will continue.<\/p>\n<p><strong>College Center<\/strong><br>\n\u00ef Renovate restrooms on first and second floor near the bookstore and near the art gallery and Hill Theatre.<\/p>\n<p><strong>Electronic signage\/marquee<\/strong><br>\n\u00ef New signs installed this summer.\u2020 Two 8-foot by 16-foot LED panels at the corner of Collegeview Road and County Road 22. (Identical product to electronic sign at Graham Park, though smaller)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Echo staff report Bring a hard hat if you\u2019re going to be on campus this summer. There will be a flurry of construction projects. Here\u2019s an overview of the renovations scheduled across campus immediately after commencement. Plaza-Memorial Hall project Work continues on the project, with anew flurry of activity beginning shortly after commencement including: \u00ef [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_members_access_role":[],"_members_access_error":""},"categories":[51,48],"tags":[],"class_list":["post-7980","post","type-post","status-publish","format-standard","hentry","category-news","category-campus"],"_links":{"self":[{"href":"https:\/\/www.rctc.edu\/echo\/wp-json\/wp\/v2\/posts\/7980","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.rctc.edu\/echo\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.rctc.edu\/echo\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.rctc.edu\/echo\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.rctc.edu\/echo\/wp-json\/wp\/v2\/comments?post=7980"}],"version-history":[{"count":0,"href":"https:\/\/www.rctc.edu\/echo\/wp-json\/wp\/v2\/posts\/7980\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.rctc.edu\/echo\/wp-json\/wp\/v2\/media?parent=7980"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.rctc.edu\/echo\/wp-json\/wp\/v2\/categories?post=7980"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.rctc.edu\/echo\/wp-json\/wp\/v2\/tags?post=7980"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}